Back to selected work

01 / Academic · Library / 2026

Flowline Library

Reading between landscape and light.

Project
Unbuilt student design
Location
University of Houston campus, Houston, Texas
Year
Spring 2026
Design / study
Mayar Badi
Course
ARCH 1501
Credit
Design by Mayar Badi. The portfolio identifies Rio House by Olson Kundig as the design precedent.

Reading between landscape and light.

Two shifted volumes sit beneath a continuous tilted roof, creating a sequence of open reading spaces along a narrow campus site. The roof directs rainfall into a linear pool, making water part of the experience of moving through the library. Concrete supports double as communal bookshelves, while rotating frosted-glass panels give students control over privacy and openness. A glass bridge connects the upper level and frames views into the tree canopy.

The project develops a sequence of shared and quieter spaces through level changes, layered thresholds, and a continuous relationship to the outdoors. Physical models, plans, and sections test how structure, enclosure, and circulation come together.

Next project / 02

Bağlantı Bridge

Let's start a conversation

Based in Houston, Texas

Good spaces begin