Architecture & Design

Selected portfolio / 2023—2026

MAYAR BADI

Exploring the spaces
that bring us together.

Architecture student at the University of Houston. Thinking through drawing, making, and the way we live.

Selected work (08)

From first sketches to spaces for everyday life.

Download the 2026 portfolio · 25 MB

A little about me

Architecture begins
with people.

Physical model stair and water channel
Thinking by making.
Detail from the Flowline Library physical model, 2026.

I’m Mayar, an architecture student at the University of Houston’s Gerald D. Hines College of Architecture and Design.

I’m interested in how spaces can support learning, healing, and connection. Through drawing, digital visualization, and physical models, I explore the relationships between people, light, and landscape.

My interest in design began with baking: a first lesson in creativity, adaptation, and problem solving. Today, that same curiosity guides my studio work and has grown through two summer internships with PBK Architects.

View my résumé

Education

University of Houston
Bachelor of Architecture student · GPA 3.90
Gerald D. Hines College

Guthrie Center
Architectural Design · 2022–2025

Experience & leadership

PBK Architects
Architectural Summer Intern · 2024 & 2025

UH Hines College Student Council
Student Representative · 2025–present

Tools & craft

AutoCAD & Revit certified · Rhino · SketchUp
Illustrator · Photoshop · InDesign · Twinmotion
Physical modeling · Architectural drawing

Selected recognition

2024

AIA Michael G. Meyers Competition

First Place, Individual · Spark Center

2024

Texas Society of Architects

Most Outstanding Individual · Bağlantı Bridge

2023

Texas Society of Architects

Most Outstanding Individual · Children’s Healing Facility

Let's start a conversation

Based in Houston, Texas

Good spaces begin
with a conversation.